TED 476714-2026 Microtunnel Landfall Vierow

As part of the scope of this tender, the Contractor shall be responsible for the design and construction of two microtunnels (MTs). Each microtunnel shall accommodate ducts for three high-voltage direct current (HVDC) power cables and fibre optic cables. The landfall for the planned Ostwind 4 (OW4) HVDC cable system is located in Vierow, on the shores of the Greifswalder Bodden in Mecklenburg-Western Pomerania, Germany. For this landfall, the construction of one microtunnel with cable ducts is foreseen. The landfall for the planned Bornholm Energy Island (BEI) HVDC cable system is likewise located in Vierow, at the Greifswalder Bodden. Here, the construction of one microtunnel with cable ducts is also planned. The landfall for the BEI project on the island of Bornholm is not included in the scope of this tender. Furthermore, the delivery and installation of the power cables are not part of this tender either. The landfall structure will be used to accommodate power cables. The subject of the contract is the full scope required for the planning and execution of the complete landing structure.

Publikationsnummer: 476714-2026 Veröffentlicht: 2026-07-10 Auftraggeber: 50Hertz Offshore GmbH, Berlin Geschätzter Wert: 43793970.0 EUR

Daten und Ressourcen

Zusätzliche Informationen

Feld Wert
Zuletzt aktualisiert August 15, 2026, 17:59 (UTC)
Erstellt August 15, 2026, 17:59 (UTC)
buyer_city Berlin
buyer_country DEU
buyer_name 50Hertz Offshore GmbH
contract_type works
cpv_codes 45230000
cpv_main 45230000
document_type can-standard
estimated_value 43793970.0
estimated_value_currency EUR
language DEU
notice_title Microtunnel Landfall Vierow
notice_version 1
nuts DEA22
procedure_id 36e03566-ca34-4a20-9ce9-ac737e19a136
procedure_type neg-w-call
publication_date 2026-07-10
publication_number 476714-2026